Each solar street lamp manufacturers have their own set of production process, you have to understand it? The following bright night lighting factory will give us a brief introduction to this issue.


1. Spare parts inspection, all kinds of raw materials according to the corresponding standard test;

2. Solar lamp manufacturers lamp beads welded to the aluminum plate, and the lamp bead board for testing;

3, the constant current source (drive) for the patch, plug-in, wave soldering or reflow, and assembly, testing, aging;

4. Assembly: the lamp beads, constant current source (drive) lamp shell assembly together; to ensure good heat dissipation;

5. After the installation of the entire lamp inspection lamp, you need to do a series of tests to ensure its good quality.

Inspection items a) not connected before the constant current source lamp power test after the light is observed to see whether there is a dead light lamp phenomenon is not bright or whether there is a short circuit and so on undesirable phenomena. Power test must be done for each product.

B) aging test after connection to a constant current source. Lamp manufacturers of lighting aging is mainly to see after a long period of time lighting the temperature, voltage, current, luminous flux. Whether there are dead lights and other undesirable phenomena. Aging test can be sampling, time in accordance with the specific needs

Test, the whole lamp assembly drive patch / plug / assembly power test test, aging, waterproof inspection, appearance inspection, welding lamp beads, packaging, feeding, inspection, the whole lamp aging to normal test within 2 days. Measuring temperature should be close to the bottom of the probe aluminum plate.

C) appearance and waterproof test lighting installation is complete, check the appearance, with or without wear, the installation is in place. And in accordance with the protection level of waterproof test.

 
6. Packaging storage equipment in accordance with the size of the larger factories, mainly: reflow, wave soldering machine, placement machine, vertical or horizontal photometric distribution (measured with light curves, luminous flux and other parameters), production can not estimate.